Overview · property snapshot▼
The program and project at a glance, live with your current settings.
Upside build-up: IRR by lever category▼
Each bar is a full re-run of the engine. Starting from the red base case, levers are switched on one category at a time at your current settings. The final bar is the all-in levered IRR.
Sources & uses▼
How the capital stack is filled, and where it goes.
Development budget▼
Standard cost categories with per-unit, per-GSF, and share of total.
Stabilized operating statement▼
Forward 12-month NOI at exit, the income a buyer capitalizes.
Return summary▼
Levered returns to the equity at your current settings.
Debt & exit▼
Senior financing and the sale waterfall.
Sensitivity: exit cap rate × hard cost▼
Each cell is a full re-run of the model. Rows vary the residential exit cap rate; columns vary residential hard cost ($/SF). The bordered cell is your current case.
Levered cash flow▼
Equity out during construction, operations through stabilization, then the exit. Monthly detail with an annual summary.